Supply chain planning and inventory optimization, aligned with your service level.

Too much capital tied up in inventory, parts still missing, and materials planning in constant firefighting mode? We work out with you how reliably each material must be available and align inventory and materials planning with that service level. This works in live operations as well as during an ERP migration.

Methods and systems
  • ABC/XYZ analysis and material segmentation
  • Materials management (MM) and materials planning (MRP) in SAP S/4HANA and ECC
  • Demand forecasting with measured forecast accuracy

Typical situations

Inventory grows, and the shortages remain.

The same safety stocks and lot sizes apply to all materials. So slow-moving items tie up capital, while fast-moving parts are missing when production or customers need them.

The MRP list does not help.

Planners decide without the information they need. Planned values are overwritten by hand, and purchase requisitions arrive without a supplier.

A central warehouse is to supply several plants.

Replenishment, MRP areas, and the interface to the logistics service provider's system need new rules while operations keep running. Anything missing from the concept shows up in the plants as shortages.

What we take on

We translate your targets for availability and tied-up capital into parameters, forecasts, and rules that planners work with every day.

  • Inventory optimization with safety stocks, service levels, and days of supply, based on an ABC/XYZ analysis
  • Materials planning and MRP: MRP procedures, reorder point planning, lot sizes
  • Demand planning and demand forecasting with measured forecast accuracy, including in spare parts management; we lead AI forecasting projects and direct them from a business perspective
  • Central warehouse and supply concepts, including for consolidated warehouse sites
  • Managing logistics service providers through service level agreements (SLAs) and KPIs such as on-time delivery and inventory accuracy
  • Source determination and purchasing master data: source lists, purchasing info records, planned delivery times

Typical levers

High inventory, shortages, and manual work in materials planning often have the same causes.

SymptomCommon causeApproach
Inventory too high, yet shortages persistBlanket lot sizes and safety stocksSafety stocks and lot sizes for each material segment
Planned values are overwritten by handThe procedure does not fit the demand, and accuracy is not measuredThe right procedure for each demand pattern, forecast accuracy as a KPI
Spare parts sit for years or are missing when equipment failsRare demand, planned like steady consumptionProcedures for rare demand, safety stock based on the consequences of a failure
Plants and the central warehouse stock the same partsEach level plans for itselfDecide which material is stocked where, with replenishment rules
Delivery dates are unreliablePlanned delivery times not updated for yearsComparison with actual delivery times, a rule for maintaining them
Purchase requisitions without a supplierNo source list, no regular supplier, no valid info recordsSource determination via source list and purchasing info records
MRP list too long to readNo exception filtersException messages and filters that fit how planners work
Disputes over the logistics service provider's performanceSLA without measurable KPIsMeasurable KPIs in the SLA, evaluated jointly

From our projects

We have designed and implemented materials planning (MRP) procedures, from the planning concept to reporting that planners can work with.

Large enterprise, logistics

Warehouse consolidation and materials planning

We are reviewing MRP procedures and developing materials planning concepts for a central warehouse that supplies several plants. We also define the requirements for the interface to a logistics service provider's system.

Our role: Consulting and project management, ongoing engagement

Spare parts planning

AI-based demand forecasting for spare parts

We served as project lead and product owner, directed forecasting, simulation, and forecast accuracy measurement from the business side, and signed off on the results.

Our role: Project leadership and product ownership

More project examples

Step by step

We start with the data and hand over as soon as data maintenance works in day-to-day operations.

  1. Analysis

    Evaluating inventory, consumption, and parameters, and talking to planning, purchasing, and the warehouse.

  2. Concept

    Procedures, lot sizes, and safety stocks for each material segment, coordinated with the business.

  3. Implementation

    Configuration, data maintenance, and changes to the reporting, managed as user stories.

  4. Measure and fine-tune

    After the first MRP runs, we check inventory, availability, and forecast accuracy and adjust the parameters.

Starting point

Analysis of inventory and MRP parameters

If your warehouse ties up too much capital although materials are missing, the analysis shows which materials and parameters to start with. In the initial call, we agree on which plants and material groups we look at.

What you get
A report with the findings in order of priority and proposals for parameters by material segment. It also contains maintenance rules for planned delivery times and sources of supply.
What we look at
Inventory, days of supply, consumption, and forecasts. MRP parameters such as procedures, lot sizes, and safety stocks, and purchasing master data such as planned delivery times and purchasing info records. Plus the MRP run report.
What we need from you
Read access or data extracts for inventory, consumption, and material and purchasing master data, plus interviews with planning, purchasing, and the warehouse.
How it works
With planning, purchasing, and the warehouse, we identify where shortages and excess inventory arise. Then we analyze parameters and consumption. We discuss the order of the changes with the business.

What you take away

  • Inventory analysisWhere inventory ties up capital and where materials are missing, by material segment.
  • Materials planning conceptProcedures, lot sizes, and safety stocks for each segment, plus a KPI for forecast accuracy.
  • Maintenance rules and user storiesWho maintains which data and when, plus specifications for configuration and interfaces that teams can implement.

Questions about this service

How can we cut inventory without risking stockouts?

By having the inventory of each material follow its demand instead of a blanket rule. We divide your materials into segments by value and demand pattern. For each segment, you decide with us how reliably it must be available; safety stocks and lot sizes follow from that.

How do you plan spare parts with rare demand, for example using Croston's method?

With procedures for sporadic demand or with probabilistic forecasts. You decide how much safety stock a part needs based on the consequences of a failure.

Do we need a new tool or AI for better forecasts?

Usually not at the start. We first measure, for each material segment, how accurate today's forecast is, for example using MAPE. An AI model only pays off if it is measurably more accurate; we lead such projects and direct them from a business perspective.

Do you also offer SAP MM and MRP consulting for purchasing and materials planning?

Yes, from source determination and purchasing master data to evaluating the MRP run in the MRP list. In SAP S/4HANA and SAP ECC, we also work hands-on in the system on request.

What happens to our classic WM warehouse in S/4HANA?

Classic Warehouse Management (WM) is only available in limited form in S/4HANA. We work out your warehouse requirements, prepare the decision between Stock Room Management and EWM, and lead the project on request. What applies to WM in S/4HANA